| ABBREVIATION |
TERM |
| "A" Building |
Administrative Building "A" |
| ADA |
American Disabilities Act |
| A/E Team or Design Consultant Team |
The entity performing design services under contract with the District |
| ACG&AVA |
ACG Environments & Anil Verma Associates, CPM for LATTC |
| AES |
Asbestos Environments & Safety, Hazardous Material Consultant |
| AIA |
American Institute of Architects |
| ALTA Survey |
American Land Title Association |
| Ameresco |
Consultant for the Solar PV Panel System |
| AOR |
Architect of Record |
| APM |
Area Program Manager is Representative for PM Team |
| ARB, Inc |
Design Build Contractor for Olive Street Parking Structure |
| ARUP |
Arup Group, Ltd. |
| ATC |
ATC Associates, Inc.- HAZMAT & Environmental Consultants |
| AWA |
Amador Whittle Architects- A/E Team for the Construction Technology Yard |
| "B" Building |
Construction Technology Building |
| BAS |
Building Automated Systems |
| BDA |
Brown Davis & Associates, Inc.- Asset Assesment Team for Phase 1 of the LACCD Program |
| BOD |
Basis of Design |
| BOT |
Board of Trustees |
| BP |
Booster Pump |
| BPA |
Board Proposed Agenda |
| BPR |
Business Process Re-Engineering |
| "C" Building |
Printing Shop Building |
| CAA |
Campus Asset Assessment |
| CADD |
Computer Aided Drafting & Design/Computer Aided Design Development |
| CAJA |
Christopher A. Joseph & Associates (Consultant for the Addendum + 30-year EIR plan) |
| CD |
Construction Documents |
| CDC |
Child Development Center |
| CEQA |
California Environmental Quality Act |
| C.G. Construction |
Contractor for Math & Science Building Pumps and Others Project |
| Cleveland Wrecking |
Subcontractor to Project Development Group, prime contractor of the South Campus Demolition project. |
| Construction Technology Yard Building |
Building at the Construction Technology Yard (not "B" Building) |
| COP |
Change Order Proposal |
| CPM |
Campus Project Management Team-LATTC / Campus Project Manager is ACG&AVA, a joint venture |
| CSI |
Construction Specifications Institute |
| CSS |
Construction Specialty Services - Constructability Review Consultant |
| CTL ES |
CTL Environmental Services- HAZMAT & Environmental Consultants |
| CTY Building |
Construction Technology Yard Building |
| Cx |
Commissioning |
| "D" Building |
Fashion & Cosmetology Building |
| D/B |
Design Build |
| DD |
Design Development |
| DEIR |
Draft Environmental Impact Report |
| District |
The Los Angeles Community College District |
| DMJM/JGM |
Daniel, Mann, Johnson, & Mendenhall / Jenkins Gales & Martinez, Inc. |
| DOT |
Department of Transportation |
| DSA |
Division of State Architect |
| e7 Studio / Apprentice |
Additional 1% Cost Allocation for new Rebaseline Budget. |
| EIR |
Environmental Impact Report |
| ER |
Emergency Resolution |
| ESA |
Environmental Site Assesment |
| ESCO |
Energy Services Companies |
| "F" Building |
Auto Metal Building |
| "F" Ramp |
Ramp adjacent to the "F" Building (Auto Metal Building) |
| FTA |
Federal Transit Authority |
| FEIR |
Final Environmental Impact Report |
| FEMA |
Federal Emergency Management Agency |
| FF&E |
Furniture, Fixtures & Equipment |
| FLS |
Fire Life Safety |
| FPP |
Final Project Proposal |
| GIS |
Geographical Information System |
| "G" & "J" Buildings |
Together they comprise the Gymnasium Building Project |
| G Coast |
G. Coast Construction, Contractor |
| "H" Building |
Culinary Arts Building |
| HABS |
Historic American Building Survey |
| HAZMAT |
Hazardous Material |
| HFG |
Hanscomb, Faithful and Gould- VE Consultants for South Campus |
| HSR |
Historic Structures Report |
| HVAC |
Heating, Ventilation & Air Conditioning |
| IC |
Infrastructure Committee |
| IOR |
Inspector of Record |
| IT |
Information Technology |
| JEM Industries |
Contractor for Removal of Existing Underground Fuel Tanks Project |
| "K" Building |
Math & Science Building |
| KAI |
Kishimoto Architects Inc. - A/E Consultant for "F" Ramp Project |
| KCI |
Kahromic Contracting Inc. - Contractor for Construction Technology Yard Project |
| KPMG |
KPMG LLP, the U.S. member of KPMG International - DMJM/JGM Auditors |
| LACB |
Learning Assistance Center Basement - Basement for Building "L" |
| LACCD |
Los Angeles Community College District |
| LADBS |
Los Angeles Department of Building & Safety |
| LADOT |
Los Angeles Department of Transportation |
| LADWP |
Los Angeles Department of Water and Power |
| LAFD |
Los Angeles Fire Department |
| LATTC |
Los Angeles Trade Technical College |
| LATTC Representatives |
Comprising of President, Vice President & Facilities Manager for LATTC |
| LAUSD |
Los Angeles Unified School District |
| LEED TM |
Leadership in Energy & Environmental Design |
| LRC Building |
Learning Resource Center Building |
| L.S. Lichty Associates |
Campus Telephone and Telecommunications Consultant |
| MDA JF |
MDA Johnson Favaro - A/E Consultant for South Campus Project |
| M & E |
M & E Electrical, Electrical Consultant |
| M & M |
M & M Electrical Contractor |
| MMRP |
Mitigations Monitoring & Reporting Program |
| MSDS |
Material Safety Data Sheets |
| MSP |
Master Security Plan |
| N & S Towers |
North & South Towers of South Campus |
| NATEC International |
ESA Consultants for Property on 2105 Olive Street |
| NOP |
Notice of Preparation |
| NRC |
National Roofing Company |
| NSAR |
North & South Building, Autocourt & Recreational Area |
| NSA Construction Group |
Contractor for the F Ramp Project |
| NTP |
Notice to Proceed |
| OCIP |
Owner Controlled Insurance Program |
| OINC |
LACCD Board of Trustees Oversite Infrastructure Committee |
| OPR |
Owner's Project Requirements (Doc. prepared by Commissioning Authority for South Campus Project ) |
| PBA |
Proposed Board Agenda |
| PBWS Architects |
A/E Consultant for Culinary Arts project, Bldgs. 'D', 'B' and 'K' , ADA/FLS Survey, Renovation of 4 Cometology Studios. |
| PCR |
PCR Services Corporation - Environmental Consultant for EIR |
| PDG |
Project Development Group - Contractor for South Campus Demolition Project |
| P.O. |
Purchase Order |
| POC |
Point of Connection |
| PLA |
Project Labor Agreement |
| PM |
Program Manager-LACCD Program Management Team of which Program Manager is DMJM/JGM, a joint venture. |
| PMP |
Program Management Plan |
| PPE |
Personal Protective Equipment |
| PPG |
Purchase Planners Group - Furniture vendor |
| Program Director |
Director of LACCD Proposition 'A' Bond Program |
| Project Director/College Design Team or Design Project Team |
Team comprised of the College President, Staff & Faculty Representatives, A/E, Sub-Consultants, Specialty Consultants, College Project Manager & Program Manager |
| PSK |
Pugh, Scarpa & Kodama - A/E Consultant for Gymnasium Project |
| PV |
Photo Voltaic |
| QA/QC |
Quality Assurance/ Quality Control |
| QC |
Quality Control |
| RFB |
Request For Bid |
| RFC |
Request for Contract |
| RFI |
Request for Information |
| RFP |
Request for Proposal |
| RFQ/SOW |
Request for Qualifications/Statement of Work |
| SD |
Schematic Documents |
| § |
Section |
| SMP |
Scheduled Maintenance Program |
| SOS |
Scope of Services |
| SWPPP |
Storm Water Pollution Prevention Plan |
| TDM |
TDM Architects - Tegtmeyer Depanian Miller - Architects-A/E Consultants for Auto Metal Building |
| TO |
Task Order |
| TRC |
TRC-EASi - Security, Safety & Fire Alarm System Consultant |
| UBC |
Uniform Building Code |
| USGBC |
U.S. Green Building Council |
| VE |
Value Engineering |
| VP Administration |
Vice President of Administration |
| WBS |
Work Breakdown Structure (Budget Establishment Format for each Project) |